Progress Update | 68-71 Newman Street A recent visit to 68–71 Newman Street highlighted not only the impressive temporary works & engineering coordination currently enabling the next phase of this complex city-centre redevelopment, but also some significant recent project achievements. The team successfully completed the �� ���� & ����� ����� ����������� ����� �� ���������, with the tower crane now installed & operational. As significant structural alterations take shape, the project is showcasing some of the most interesting stages of construction: 🔹 Existing columns supported above ground level on specially designed temporary steel frames & piles 🔹 Large openings formed through the building structure 🔹 Temporary works supporting slab edges while new steel frames are installed A big thank you to Dimitrios & Enver whose dedication has played an important role in helping the project reach these key milestones and the support from James & Chris of the Galliford Try team who have helped with the coordination and collaboration�